Producing your first 100 garments is a major step for a clothing brand. It is also the point where the difference between a unit price and a total production budget becomes important. A factory may quote one price for cutting and sewing, while fabric sourcing, sample development, printing, labels, inspection, and freight are quoted separately. Understanding those pieces helps you plan a launch without surprise costs.
There is no universal price for 100 pieces. A basic jersey T-shirt, a heavyweight washed hoodie, and a fully lined jacket require different materials and levels of labor. This guide explains the cost structure and shows how to compare estimates fairly.
Start with the garment, not a price per piece
Before requesting a quote, define the product. A useful request includes a front-and-back design, fabric composition and weight, construction details, target measurements, color count, size breakdown, print or embroidery specifications, packaging, and destination. If your design is not finalized, ask the manufacturer to quote development first rather than treating an early bulk estimate as firm.
The same 100-unit total also behaves differently depending on its breakdown. One style in one color is simpler than 100 units divided among five colors, because each color may require separate fabric, dye, trims, and production planning. Confirm whether the factory counts its minimum order quantity by style, color, or combined order.
Separate one-time costs from per-unit costs
Development costs commonly include tech packs, pattern making, fit corrections, grading, and physical samples. These activities may be charged once per style or again when revisions are substantial. They should not be hidden inside a vague unit price.
Recurring manufacturing costs include the garment's fabric consumption, cutting, sewing, finishing, decoration, labels, and packaging. A fabric that costs more per yard can also increase waste when a garment has large panels or directional prints. Complicated pockets, panels, washes, and seam finishes increase operations at the sewing line.
Logistics costs can include cartons, freight, insurance, customs brokerage, duties, and domestic delivery. Ask whether the quote is for factory pickup, freight to a port, or delivered to your address. Those are different commercial arrangements.
Example: a hypothetical 100-piece budget
The following figures are an illustration of how to build a budget, not a SeamLink quote or current market price. Replace every number with supplier-specific estimates before making a purchase decision.
Budget component Illustrative calculation Example total Development and fit sample One-time allowance $350 Fabric, trims, cutting, sewing, finishing 100 × $14 $1,400 Decoration and branding 100 × $3 $300 Packaging 100 × $1 $100 Shipping, customs and delivery allowance Project allowance $450 Estimated project total $2,600
This model produces an illustrative all-in cost of $26 per sellable unit, before any separate photography, platform fees, marketing, or returns. A real quote could be much lower or higher. If 10 pieces cannot be sold, the realized cost per sellable piece changes even when the factory invoice does not.
Why small orders often cost more per unit
A factory incurs setup work whether you order 100 units or 1,000. Patterns must be confirmed, material must be procured, cutting must be planned, and the sewing team must learn the style. A smaller run spreads those activities across fewer garments.
Small orders can also encounter higher material prices when fabrics are bought from available stock instead of mill-level quantities. Stock fabrics may be the right choice for testing demand, but their color and replenishment availability should be confirmed early.
Avoid chasing the lowest possible per-unit number if it means skipping essential fit or quality checks. One production mistake can be more expensive than the savings offered by a cheaper supplier.
Compare quotes using the same assumptions
Ask every potential manufacturer these questions:
Is the quantity 100 units of one style, and how many colors can it include?
Which fabric composition, GSM, width, and finish are included?
Are patterns, samples, grading, labels, and decoration charged separately?
Does the quote include quality inspection and what defects are considered acceptable?
Which shipping method and trade term are being used?
Is the stated date a ship-out date or the date the goods should arrive?
What changes to the design would require a revised quote?
Request a line-item estimate and keep the approved version with your tech pack. If a supplier says a feature is 'included,' ask them to write it into the quote.
Price your product from landed cost, not factory price
Your landed cost is the amount spent to get the merchandise to the agreed destination. It is the more useful number for setting retail prices and calculating gross margin. Then account for additional selling expenses such as photography, payment processing, storage, customer shipping subsidies, advertising, returns, and unsold inventory.
If you intend to reorder, ask what changes once the patterns and fit are already approved. Some development work can be reused, but raw-material prices, minimums, and freight will still vary.
A better first step
Bring a sketch or reference garment, quantity, material preference, size range, and required in-hand date to your production consultation. SeamLink can help organize those details, identify missing specifications, and build a more comparable estimate before you commit to bulk production.